P-5125

Ensenada School Improvement

Description

Financing

Documents

Photos

History Logs

Project Description

Country: Mexico

Location: Ensenada

Total Budget: $5,400

Area of Focus: Basic education and literacy

Activity Type: Community Development: Construction/Renovation

Summary: Ceiling fans, classroom lighting, and reading rugs for children in Ensenada, Mexico


In 2023, the La Jolla Golden Triangle Rotary Club completed a painting project at a primary school in Ensenada. During the scouting trip, the teachers informed club members that they needed some additional resources for students, including ceiling fans in the classrooms to help cool the rooms during the hot months, improved classroom lighting, and rugs to provide a comfortable place for the children to sit on during reading time. The grant will fund the purchase and installation of ceiling fans, track lighting, and area rugs in each of the classrooms, which will be installed by club members and local tradesman during a club trip to complete additional painting and renovations.

Project Contact Person

District: 5340

Rotary Club of: La Jolla Golden Triangle

Primary Contact: Ranjan Lahiri

Email: raloklahiri@gmail.com

Project Status

Paid
This project is "Paid". This means that the funds from the district have been issued. This project is now being ready for implementation. When this is done, a report needs to be uploaded on the project page and the "Reported" button needs to be clicked, then the status of the project will be changed to "Reported".

Project listed for the 2024-25 Rotary Year.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

La Jolla Golden Triangle (5340)

21-Apr-24

$3,700

$1,700

$5,400

Total

$3,700

$1,700

$5,400

Project Supporting Documents


[30-Jul-24]
Bank Deposit Info


[30-Jul-24]
Project Equipment Scope


[21-Jul-24]
Scouting Notes

 

Project Photos

History Log Entries

23-Jul-24

by Ranjan Lahiri

System Entry: Project sent for club signatures.

23-Jul-24

by Ranjan Lahiri

System Entry: Project signed by Ranjan Lahiri.

23-Jul-24

by Luke Ervin

System Entry: Project signed by Luke Ervin.

12-Sep-24

by Alan Turner

System Entry: Project approved by the District Approval Committee.

18-Nov-24

by Dave Brooks

System Entry: Check for DDF payment issued by Foundation Treasurer.

© 2010 Philippe Lamoise - Website design by Philippe Lamoise, D2G Online